Quobyte GPU Converged Savings Calculator
Turn your GPU nodes into a world-class storage cluster. Plug in your specs to see your 3-year infrastructure savings.


Quobyte GPU Converged Storage Savings Report
| Infrastructure Metrics | GPU Converged | Dedicated Servers | Appliances |
|---|---|---|---|
| Total Raw Capacity | 0 TB | ||
| The Facts | |||
| Hardware (Chassis + SSD + Ports) | $0 | ||
| Software Subscription (3-Year) | Included | ||
| Annual Support Cost (3-Year) | Included | Included | |
| High-Speed Ports Required | 0 | ||
| Rack Space Required | 0 U | ||
| Total Power Consumption (3-Year) | |||
| Data Center OpEx (Power + Rack) | |||
| Total 3-Year TCO | |||
| Potential Savings with GPU Converged | |||
| Financial Savings | |||
| Ports Saved | - | ||
| Power Avoided | |||
Estimates for power are based on 115W incremental draw per GPU node (Quobyte), 850W per Dedicated Server, and 980W per Appliance.
The DC Rack Cost per Unit ($/U/Yr) includes physical floor space lease, high-density cooling (CRAC/In-Row), PDU overhead, and physical security. Component-level power draw is calculated separately via "Cost per kWh" for granular accuracy.